| Year | Task | Location | Client | Subsea Material | Water Depth | Application |
| 2009 | Pipeline Burial | U.S. G.O.M | Cal-Dive | Soft pre-disturbed material | 200' | New Installations |
| 2009 | Drill Cutting Removal | Offshore China | CTC Marine | Mixed Clays | 107m | Salvages/Decommissioning |
| 2009 | Rock Dump Removal | Russia | Sakhalin Energy (new client) | Rock Dump | 50m | Inspection, Maintenance, & Repair |
| 2009 | Platform Salvage | U.S. G.O.M | Chevron | Medium Clay | 180' | Salvages/Decommissioning |
| 2009 | Wellhead excavations | U.S. G.O.M | Chevron | Mixed Clays | 43m | Salvages/Decommissioning |
| 2009 | Backfill Removal | U.S. G.O.M | Chevron | Soft Backfill | 42m | Salvages/Decommissioning |
| 2009 | Caisson Excavation | U.S. G.O.M | Proserv | Medium To Soft clays | 54m | Salvages/Decommissioning |
| 2009 | Caisson Removal | U.S. G.O.M | Tetra Technologies | Soft Clay | 47m | Salvages/Decommissioning |
| 2009 | Drill Cutting Removal | Romania | GSP (new client) | Soft Clay | 95m | Inspection, Maintenance, & Repair |
| 2009 | Caisson Excavation | U.S. G.O.M | Energy XXI | Mixed Clays | 40m | Salvages/Decommissioning |
| 2009 | Platform Excavation | U.S. G.O.M | Epic Divers | Soft | 95m | Salvages/Decommissioning |
| 2009 | Caisson Excavation | U.S. G.O.M | Express | Mixed Clays | 22m | Salvages/Decommissioning |
| 2009 | Pipeline Trenching And Freespan Rectification | Iran | (new client that have not allowed us to use their name) | Soft, Silty Clay | 64m | New Installations |
| 2009 | Toppled Platform Recovery With Soil Strengths Measured To 140 kPa | U.S. G.O.M | Chevron | Soft Mud to Hard Clay | 37m | Inspection, Maintenance, & Repair |
| 2009 | Caisson Excavation | U.S. G.O.M | Energy XXI | Mixed Clays | 40m | Salvages/Decommissioning |
| 2009 | Pipeline Trenching | U.S. G.O.M | Epic Divers | Soft Clay | 84m | Inspection, Maintenance, & Repair |
| 2009 | Platform Leg excavations | U.S. G.O.M | OSFI | Soft Mud | - | Salvages/Decommissioning |
| 2009 | Pipeline excavation of 3000' of 36" Pipeline | U.S. G.O.M | Cal-Dive International | Soft Mud | 18m | Inspection, Maintenance, & Repair |
| 2009 | Debris Removal | U.S. G.O.M | Wild Well Control | Soft Clay | 50m | Salvages/Decommissioning |
| 2009 | Pipeline excavation of 3000' of 36" Pipeline | U.S. G.O.M | Cal-Dive International | Soft Mud | 18m | Inspection, Maintenance, & Repair |
| 2009 | Debris Removal | U.S. G.O.M | Wild Well Control | Soft Clay | 50m | Salvages/Decommissioning |
| 2009 | VK 20" Visual Inspection | U.S. G.O.M | Cal-Dive / Enterprise | Mudslide Area | 204m | Inspection, Maintenance, & Repair |
| 2009 | Tie-in Excavations | U.S. G.O.M | Global Industries / Stone Energy | Soft Mud | 206m | Inspection, Maintenance, & Repair |
| 2009 | Caisson Excavation | U.S. G.O.M | Tetra Technologies | Medium Clay | 51m | Salvages/Decommissioning |
| 2009 | Debris Removal | U.S. G.O.M | Wild Well Control | Soft Clay | 66m | Salvages/Decommissioning |
| 2009 | Rock Dump Removal 8" Pipeline | North Sea | Bibby Offshore/Talisman | Rock Dump | 116m | Inspection, Maintenance, & Repair |
| 2009 | Lift Boat Excavation | U.S. G.O.M | Bosarge/Exxon | Soft Mud | 15m | Inspection, Maintenance, & Repair |
| 2009 | Pipeline excavation of 3000' of 36" Pipeline | U.S. G.O.M | Cal-Dive International | Soft Mud | 18m | Inspection, Maintenance, & Repair |
| 2009 | Jacket Excavation | U.S. G.O.M | Apache | Soft Clay | 72m | Salvages/Decommissioning |
| 2009 | Deck Salvage Excavation | U.S. G.O.M | Apache | Soft Mud | 69m | Salvages/Decommissioning |
| 2009 | Jacket and Debris Excavation | U.S. G.O.M | Apache | Soft Clay | 61m | Salvages/Decommissioning |
| 2009 | Caisson Excavation | U.S. G.O.M | Explore Enterprises | Silty Sand | 20m | Salvages/Decommissioning |
| 2009 | Caisson Excavation | U.S. G.O.M | Tetra Technologies | Soft Clay | 76m | Salvages/Decommissioning |
| 2009 | Platform Salvage | U.S. G.O.M | Pioneer | Soft Clay | 70m | Salvages/Decommissioning |
| 2009 | Well Head Excavation | U.S. G.O.M | Wild Well Control | Medium Clay | 25m | Salvages/Decommissioning |
| 2009 | Pipeline excavation: 2,000' of 12" | U.S. G.O.M | Global Industries | Soft Clay & Sand | 120m | Inspection, Maintenance, & Repair |
| 2009 | Pipeline Excavation | U.S. G.O.M | Deep Marine Technology | Medium Clay | 167m | Inspection, Maintenance, & Repair |
| 2009 | 50m Deburial of 132mm Cable | North Sea | Subocean | Sand | 2-7m | Inspection, Maintenance, & Repair |
| 2009 | 350m of 10" Pipeline Deburial | Australia | DOF Subsea | Silt & Sand | 15m | Inspection, Maintenance, & Repair |
| 2009 | Pipeline Excavation 17,500' of 20" pipeline | U.S. G.O.M | Global Industries | Soft Clay & Sand | 76m | New Installations |
| 2009 | 2.6km of 16" Pipeline Trenching | Persian Gulf | J Ray McDermott | Soft Clay & Sand | 3-7m | New Installations |
| 2009 | Wild Well Control | U.S. G.O.M | Wild Well Control | Medium Clay | 60m | Salvages/Decommissioning |
| 2009 | Platform Recovery | U.S. G.O.M | Wild Well Control | Medium Clay | 70m | Salvages/Decommissioning |
| 2009 | Platform Recovery | U.S. G.O.M | Wild Well Control | Medium Clay | 76m | Salvages/Decommissioning |
| 2009 | 20" Pipeline Deburial | U.S. G.O.M | Legacy Offshore | Soft Clay | 204m | Salvages/Decommissioning |
| 2009 | Platform Recovery | U.S. G.O.M | Wild Well Control | Medium Clay | 30m | Salvages/Decommissioning |
| 2008 | 10" Pipeline deburial | NW Australia | Subsea7/Woodside | Silty Sand & Shells | 150m | Inspection, Maintenance & Repair |
| 2008 | Pipeline Excavation 1,200' of 24" Pipeline | U.S. G.O.M | Cal-Dive International | Soft Clay | 60m | Inspection, Maintenance, & Repair |
| 2008 | Pipeline Deburial 2,000' of 10" pipeline 15'-20' BML | U.S. G.O.M | Global Industries | Firm Clay | 152m | Inspection, Maintenance, & Repair |
| 2008 | Pipeline Deburial of damaged 6" pipeline | U.S. G.O.M | Cal-Dive International | Soft Mud | 67m | Inspection, Maintenance, & Repair |
| 2008 | Pipeline Deburial 2,000' of 12" pipeline 14' BML | U.S. G.O.M | Oceaneering International | Soft Mud | 80m | Inspection, Maintenance, & Repair |
| 2008 | Pipeline Excavation 6" pipeline buried 6'-8' BML | U.S. G.O.M | Madcon | Soft Clay | 67m | Inspection, Maintenance, & Repair |
| 2008 | Presweeping approaches to wind turbines | Belgium | Dredging International | Rock Dump | 20m | New Installations |
| 2008 | Debris basket collection and deck salvage | U.S. G.O.M | Wild Well Control | Medium Clay | 25m | Salvages/Decommissioning |
| 2008 | Two 26" well-heads 15' BML | U.S. G.O.M | Wild Well Control | Medium Clay | 72m | Salvages/Decommissioning |
| 2008 | Barge Salvage | U.S. G.O.M | Rosel | Sandy/Silty Clay | 3.5m | Salvages/Decommissioning |
| 2008 | Platform Abandonment | U.S. G.O.M | Wild Well Control | Soft Mud | 27m | Salvages/Decommissioning |
| 2008 | Trunkline Excavation | U.S. G.O.M | Cal-Dive | Soft Mud | 38m | Salvages/Decommissioning |
| 2008 | Conductor Excavation | U.S. G.O.M | Wild Well Control | Soft Clay | 37m | Salvages/Decommissioning |
| 2008 | Platform Salvage | U.S. G.O.M | Global Industries | Soft Clay | 70m | Salvages/Decommissioning |
| 2008 | Platform Salvage | U.S. G.O.M | Global Industries | Soft Clay | 70m | Salvages/Decommissioning |
| 2008 | Platform Salvage | U.S. G.O.M | Global Industries | Soft Clay | 72m | Salvages/Decommissioning |
| 2008 | Cable Burial | Qatar | J Ray McDermott | Soft Sandy Clay | 65m | New Installations |
| 2008 | Harbour Clearance | Scotland | Montrose Harbour | Stiff Mud | 12m | Harbour Clearance |
| 2008 | Cable Burial & De-Burial | UK, North Sea | Subocean/E-On | Sand & Silt | 2–12m | Inspection, Maintenance & Repair |
| 2008 | Platform Deck Salvage | U.S. G.O.M | Apache | Soft Clay | 70m | Salvages/Decommissioning |
| 2008 | Well Intervention | U.S. G.O.M | Chevron | Soft Clay | 42m | Salvages/Decommissioning |
| 2008 | Conductor Excavation | U.S. G.O.M | Wild Well Control | Soft Clay | 40m | Salvages/Decommissioning |
| 2008 | Seabed Leveling | U.S. G.O.M | Chevron | Soft Clay | 40m | New Installations |
| 2008 | Pipeline Burial | Mexico | Oceanografia | Medium Clay | 50m | New Installations |
| 2008 | Platform Salvage | U.S. G.O.M | Global Industries/Apache | Soft Clay | 72m | Salvages/Decommissioning |
| 2008 | Pipeline Deburial | North Sea | Bibby Offshore/Talisman | Soft Clay | 140m | Inspection, Maintenance & Repairs |
| 2008 | Mooring Wire Abandonment | New Zealand | TS7 | Silt | 115m | Salvages/Decommissioning |
| 2008 | 60" Caisson Excavation | U.S. G.O.M | Devon Energy | Soft Clay | 8m | Salvages/Decommissioning |
| 2008 | Well-Head Excavation | U.S. G.O.M | Chevron | Medium Clay | 46m | Salvages/Decommissioning |
| 2008 | Well-Head Excavation | U.S. G.O.M | Wild Well Control | Medium Clay | 40m | Salvages/Decommissioning |
| 2008 | Well-Head Excavation | U.S. G.O.M | Chevron | Soft Clay | 45m | Salvages/Decommissioning |
| 2008 | Pipeline Crossings | Mexico | Oceanografia | Firm Clay | 35m | New Installations |
| 2007 | Post Trenching 20” & 24” Pipelines | Mexico | Horizon/Pemex | Firm Clay | 80m | New Installations |
| 2007 | Post Trenching 36” & 24” Pipelines | Mexico | Oceanografia | Firm Clay | 35m | New Installations |
| 2007 | Post Trenching 20” Pipeline | Mexico | Oceanografia | Firm Clay | 40m | New Installations |
| 2007 | Post Trenching 12” Pipelines | Venezuela | Z&P/ConocoPhillips | Soft Mud | 10m | New Installations |
| 2007 | Post Trenching 36” Pipeline | Mexico | Oceanografia/Pemex | Firm Clay | 40m | New Installations |
| 2007 | Post Trenching 20” Pipeline | U.A.E. | COMACOE | Sandy Silt | 5-21m | New Installations |
| 2007 | Post Trenching 16” Pipeline | Mexico | Oceanografia | Firm Clay | 50m | New Installations |
| 2007 | Post Trenching 12” Pipeline | U.S. G.O.M | Chevron | Soft Clay | 40m | New Installations |
| 2007 | Pipeline Crossings | Saudi Arabia | Global Industries | Clayey Sand | 9-36m | New Installations |
| 2007 | Post Trenching 12” Pipelines | Venezuela | Z&P/ConocoPhilips | Soft Mud | 5-25m | New Installations |
| 2007 | Post Trenching 16” Pipelines | Mexico | Condux/Pemex | Firm Clay | 33m | New Installations |
| 2007 | Post Trenching 8” Pipelines | U.S. G.O.M | Con-Dive/Prime Offshore | Soft Clay | 40m | New Installations |
| 2007 | Post Trenching 16” Pipelines | Mexico | Condux/Pemex | Firm Clay | 33m | New Installations |
| 2007 | Post Trenching 8” Pipelines | U.S. G.O.M | Con-Dive/Prime Offshore | Soft Clay | 40m | New Installations |
| 2007 | PreSweeping Sandwaves & 20” Pipeline Trenching | India | Global Ind./British Gas | Soft Sand & Clay | 25-40m | New Installations |
| 2007 | Post Trenching 24’ Pipeline | Mexico | Condux/Pemex | Firm Clay | 50m | New Installations |
| 2007 | Pipeline Post Trenching | Mexico | Condux/Pemex | Firm Clay | 50m | New Installations |
| 2007 | Trenching 36” & 12” Pipeline Crossing | Mexico | Global Ind./Pemex | Sand & Mud | 50m | New Installations |
| 2007 | Valve Cover Clearance | U.S. G.O.M | Chet Morrison Contractors | Soft Clay | 50m | Inspection, Maintenance & Repairs |
| 2007 | Pipeline Deburial | UK, North Sea | Acergy/BP | Soft Clay | 30m | Inspection, Maintenance & Repairs |
| 2007 | Pipeline Deburial | U.S. G.O.M | Chevron | Firm Clay | 20m | Inspection, Maintenance & Repairs |
| 2007 | Pipeline Deburial | U.S. G.O.M | Chevron | Firm Clay | 20m | Inspection, Maintenance & Repairs |
| 2007 | Platform Salvage Excavation | U.S. G.O.M | Howard Energy | Soft Clay | 70m | Salvages/Decommissioning |
| 2007 | Platform Leg Excavation | U.S. G.O.M | Con-Dive/ENI | Soft/Medium Clay | 70m | Salvages/Decommissioning |
| 2007 | Jacket Leg Excavations | U.S. G.O.M | Chet Morrison Contractors | Soft Clay | 50m | Salvages/Decommissioning |
| 2007 | Platform Salvage/Well Excavations | U.S. G.O.M | Chevron | Soft/Firm Clay | 40m | Salvages/Decommissioning |
| 2007 | Subsea Tie-In Excavation | U.S. G.O.M | Con-Dive/NNG | Soft Mud | 55m | Tie-Ins |
| 2007 | Trench Clearing/Rock Dump Removal | Sakhalin | Saipem | Sandy Sediment | 35m | Tie-Ins |
| 2006 | Pipeline Trenching | U.S. G.O.M | Prime Offshore | Sand | 46m | New Installations |
| 2006 | Post Trenching 12”, 24” & 36” Pipelines | Mexico | Global Ind./Pemex | Sand & Clay | 66m | New Installations |
| 2006 | Post Trenching 8” & 10” Pipelines | U.S. G.O.M | Global Ind./Chevron | Soft Mud | 65m | New Installations |
| 2006 | Post Trenching 36” Pipeline | Mexico | Oceanografia | Soft Mud | 80m | New Installations |
| 2006 | Post Trenching 12” Pipeline | U.S. G.O.M | Global Ind./Chevron | Soft Mud | 70m | New Installations |
| 2006 | Spud Can Excavation | Vietnam | KNOC | Sand | 5m | New Installations |
| 2006 | Pipeline Trenching | Mexico | Horizon | Soft Clay | 60m | New Installations |
| 2006 | Pipeline Trenching | U.S. G.O.M | Global Ind./Devon | Soft Clay | 40m | New Installations |
| 2006 | Pipeline Trenching | U.S. G.O.M | Global Ind./Apache | Firm Clay | 25m | New Installations |
| 2006 | Post Trenching 24” Pipelines | Mexico | Horizon | Soft Clay | 80m | New Installations |
| 2006 | Post Trenching Pipeline | Mexico | Condux/Pemex | Soft Clay | 45m-65m | New Installations |
| 2006 | Post Trenching Pipeline | Mexico | Condux/Pemex | Soft Clay | 45-65m | New Installations |
| 2006 | Post Trenching 12” Pipeline | U.S. G.O.M | Global Ind./ElPaso | Soft Clay | 15m | New Installations |
| 2006 | Pipeline Trenching | Trinidad | Acergy | Soft Mud | 75m | New Installations |
| 2006 | Pipeline Trenching For Repair | U.S. G.O.M | BP | Soft Mud | 187m | Inspection, Maintenance & Repairs |
| 2006 | Pipeline Trenching For Repair | U.S. G.O.M | Onyx/Enterprise | Soft Mud | 230m | Inspection, Maintenance & Repairs |
| 2006 | Pipeline Trenching For Repair | U.S. G.O.M | BP | Soft Mud | 200m | Inspection, Maintenance & Repairs |
| 2006 | Conductor Excavation | U.S. G.O.M | Tetra Technologies | Soft Mud | 70m | Salvages/Decommissioning |
| 2006 | Conductor Excavation | U.S. G.O.M | Tetra Technologies | Soft Clay | 30m | Salvages/Decommissioning |
| 2006 | Well-Head & Jacket Leg Excavation | U.S. G.O.M | Newfield Exploration | Soft Clay | 32m | Salvages/Decommissioning |
| 2006 | Well-Head Excavation | U.S. G.O.M | Newfield Exploration | Firm Clay | 30m | Salvages/Decommissioning |
| 2006 | Backfilling Well Excavation | U.S. G.O.M | Magnum Hunter | Soft Mud | 50m | Salvages/Decommissioning |
| 2006 | Well-Head Excavation | U.S. G.O.M | Magnum Hunter | Soft Mud | 50m | Salvages/Decommissioning |
| 2006 | Well-Head Excavation | U.S. G.O.M | Newfield Exploration | Firm Clay | 30m | Salvages/Decommissioning |
| 2006 | Well-Head Excavation | U.S. G.O.M | Magnum Hunter | Firm Clay | 45m | Salvages/Decommissioning |
| 2006 | Subsea Tie In Trenching | U.S. G.O.M | Horizon | Firm Clay | 30m | Tie-Ins |
| 2006 | Subsea Tie In/8” Pipeline Deburial | U.S. G.O.M | BP | Soft Clay | 210m | Tie-Ins |
| 2005 | Pipeline Deburial | U.S. G.O.M | Oceaneering/Chevron | Mud | 220m | Inspection, Maintenance & Repairs |
| 2005 | Post Trenching 12”, 18” & 20” Pipelines | Mexico | Global Ind./Pemex | Firm Clay | 40m-55m | New Installations |
| 2005 | Pipeline Crossing Preparation | Mexico | Condux/Pemex | Firm Clay | 50m | New Installations |
| 2005 | Cable Burial | North Sea | Van Oord | Sand | 2m-5m | Cable Burial |
| 2005 | Berth Clearance | Scotland | Montrose Harbour | Mud/Silt | 4m-8m | Harbour Clearance |
| 2005 | Pipeline Trenching & Crossing Preparation | Mexico | Condux/Pemex | Firm Clay | 40m-60m | New Installations |
| 2005 | Pipeline Deburial | North Sea | Subsea7/Total | Sand | 110m | Tie-Ins |
| 2005 | Pipeline Trenching 30” Pipeline | Mexico | Condux/Pemex | Clay | 45m | New Installations |
| 2005 | Jetty Clearance – multiple | Indonesia | Caltex | Silt/Mud | 11m-20m | Harbour Clearance |
| 2005 | Post Trenching Of a 20” Pipeline | Mexico | Global Ind./Pemex | Firm Clay | 40-55m | New Installations |
| 2005 | Post Trenching 30” Pipeline | Mexico | Condux/Pemex | Clay | 45 | New Installations |
| 2005 | Rock Dump Removal | Sakhalin, Russia | Jan De Nul/Saipem | Large & Small Rocks | 30m | Tie-Ins |
| 2005 | Post Trenching 11” Pipeline | Mexico | Global Ind./Pemex | Clay | 20m-30m | New Installations |
| 2005 | Jacket Leg Excavations - Decommissioning | U.S. G.O.M | Cal Dive/Anadarko | Mud | 70m | Salvages/Decommissioning |
| 2005 | Post Trenching 10” Pipeline | Mexico | Condux/Pemex | Clay | 20m-30m | New Installations |
| 2005 | Post Trenching Of a 10” Pipeline | Mexico | Global Ind./Pemex | Firm Clay | 50m | New Installations |
| 2005 | Post Trenching Of a 30” Pipeline | U.S. G.O.M | CHET/SNG | Compacted Sand/Clay | 3m | Inspection, Maintenance & Repairs |
| 2005 | Post Trenching 10” Pipeline | Mexico | Condux/Pemex | Clay | 20m-30m | New Installations |
| 2005 | Post Trenching 11” Pipeline | Mexico | Global Ind./Pemex | Clay | 20m-30m | New Installations |
| 2005 | Pre-Trenching Cable | Mexico | Demar/Pemex | Firm Clay | 30m-55m | Cable Burial |
| 2005 | Post Trenching 10” Pipeline | Mexico | Global Ind./Pemex | Clay | 50m | New Installations |
| 2005 | Post Hurricane Pipeline Repair | U.S. G.O.M | Oceaneering/Shell | Mud | 1000m | Inspection, Maintenance & Repairs |
| 2005 | Post Hurricane Repair Work | U.S. G.O.M | Global Ind./Chevron | Mud | 10m | Inspection, Maintenance & Repairs |
| 2005 | Post Hurricane Conductor Deburial | U.S. G.O.M | BP | Mud | 40m | Salvages/Decommissioning |
| 2005 | Pre & Post Trenching | Sakhalin, Russia | Jan De Nul/Saipem | Sand | 10m-30m | Tie-Ins |
| 2005 | Post Trenching 44” Pipeline | U.S. G.O.M | Chet Morrison/BP | Sand | 3m–6m | Inspection, Maintenance & Repairs |
| 2005 | Post Hurricane Repair Work | U.S. G.O.M | Global Ind./Chevron | Mud | 20m–40m | Inspection, Maintenance & Repairs |
| 2005 | Jetty Clearance – Decommissioning | Azerbaijan | Technip | Silt, Mud & Soft Clay | 4m–6m | Harbour Clearance |
| 2004 | Deburial Of 32" & 24" Pipelines For inspection | UK, North Sea | Subsea7/Total | Rock Dump Removal | 110m | Inspection, Maintenance & Repairs |
| 2004 | Rock Dump Removal 300 - 400 mm | W Australia | Technip-Subsea 7/Woodside | Rock Dump Removal | 125m | Tie-Ins |
| 2004 | Post Trenching 200 mm Cable | UK, North Sea | Cns/Vestas/Van Oord | Soft Clay | 8m-15 m | Cable Burial |
| 2004 | Post Trenching 2 x 12" Pipelines | India | Clough/Niko | Firm Clay | 4m-20m | New Installations |
| 2004 | Post Trenching 12" pipleine | India | Clough/Niko | Firm Clay | 2m-5m | New Installations |
| 2004 | Post Trenching 8" Pipeline | Mexico | Global Ind./Pemex | Firm Clay | 40-50 m | New Installations |
| 2004 | Rock Dump Removal For Pipeline Deburial | UK, North Sea | Subsea 7/Total | Rock dump 100mm | 100m-110m | Tie-Ins |
| 2004 | Post Trenching 24" Pipeline | Mexico | Global Ind./Pemex | Firm Clay | 40m-50m | New Installations |
| 2004 | Post Trenching 20" Pipeline | Indonesia | Saipem/Total | Firm Clay | 5m-10m | New Installations |
| 2004 | Pipeline Deburial | UK, North Sea | Allseas | Sand | 15m-25m | Inspection, Maintenance & Repairs |
| 2004 | Numerous 8” – 6” Crossings | Mexico | Global Ind./Pemex | Firm Clay | 38m-55m | New Installations |
| 2004 | Post Trenching 20” & 24” Pipelines | Mexico | Global Ind./Pemex | Firm Clay | 40m-50m | New Installations |
| 2004 | Seabed Preparation For Tie-In Installation | UK, North Sea | Subsea 7/Total | Sands & Very Soft Clay | 43m | Tie-Ins |
| 2004 | Seabed Preparation & Post Trenching 24” Pipeline | Egypt | Stolt/Burullus | Sand & Soft Clay | 12m-40m | Inspection, Maintenance & Repairs |
| 2004 | Seabed Preparation For Habitat Installation | North Sea | Allseas | Sand & Soft Clay | 45m | Inspection, Maintenance & Repairs |
| 2004 | Jacket Leg Excavations – Decommissioning | Indonesia | IEV/Shell | Sand & Soft Clay | 85m | Salvages/Decommissioning |
| 2004 | Deburial Of A Pipeline | U.S. G.O.M | Global Ind./Chevron Texaco | Sand | 210m | Inspection, Maintenance & Repairs |
| 2004 | Post Trenching Of two Pipelines | North Sea | Subsea 7/Total | Sand | 2m-5m | Tie-Ins |
| 2004 | Pipeline Deburial | U.S. G.O.M | Global Ind./Chevron Texaco | Mud | 40m-60m | Inspection, Maintenance & Repairs |
| 2004 | Jack-up Rig Leg Recovery | U.S. G.O.M | Titan/Ensco | Firm Clay | 110m | Salvages/Decommissioning |
| 2004 | Pipeline Deburial | U.S. G.O.M | Cal Dive/Williams | Mud | 290m | Inspection, Maintenance & Repairs |
| 2004 | Pipeline Deburial | U.S. G.O.M | Oceaneering | Mud | 75m | Inspection, Maintenance & Repairs |
| 2004 | Pipeline Trenching | Mexico | Global Ind./Pemex | Firm Clay | 40m-60m | New Installations |
| 2003 | Providing Access For Hydraulic Pipeline Cutter | Singapore | Van Oord | Rock & Backfill Removal | 20m | Salvages/Decommissioning |
| 2003 | Post Trenching 600m Of 24" Pipeline In Clay | Indonesia | J Ray McDermott | Firm Clay | 5m | New Installations |
| 2003 | Post Trenching 216m Shore Approach Of 30" Pipeline | Cameroon | Global Industries | Sand & Clay | 3m-8m | New Installations |
| 2003 | Post Trenching Various Pipelines & Umbilicals | Egypt | Stolt Offshore | Sand & Clay | 8m-20m | New Installations |
| 2003 | Post Trenching Of Various Sized Pipelines | Egypt | Stolt Offshore | Sand With No Cohesion | 2m-10m | New Installations |
| 2003 | Deburial Of Mine Outfall Pipes & Area Clearance | NE Coast England | Briggs Marine | Silt | 14m | Inspection, Maintenance & Repairs |
| 2003 | Seabed Preparation For Jack-up Rig Spud Cans | Bay Of Bengal | IEV/Premier Oil | Sand | 100m | New Installations |
| 2003 | Pipeline Trenching | Mexico | Global Industries | Clay | 40m-60m | New Installations |
| 2002 | Seabed Preparation For Jacket installation | East Timor Sea | J Ray McDermott | Sands & Clay | 85m | New Installations |
| 2002 | Freespan Correction | Gulf Of Thailand | Global Industries | Mud Waves | 80m | Inspection, Maintenance & Repairs |
| 2002 | Backfilling Of 45km trench | Mexico | Horizon | Sands & Clay | 40m-60m | New Installations |
| 2002 | Post Trenching 9km Of Various Sized Pipelines | Mexico | Horizon | Sands & Clay | 40m-60m | New Installations |
| 2002 | Post Trenching Various Sized Pipelines | Egypt | Stolt Offshore | Sand With No Cohesion | 2-8m | New Installations |
| 2002 | De-burial Of Jack-up Spud Cans | Dutch, North Sea | Noble Drilling | Sands To Firm Clay | 50m-60m | Salvages/Decommissioning |
| 2001 | Post Trenching 1.1km Of 6" fibre-optic conduit | Scotland | Stolt Offshore | Sands & Light Clay | 2m-10m | Cable Burial |
| 2001 | Post Trenching Of 400m Of 35mm fibre-optic Cable | Scotland | Stolt Offshore | Sands & Light Clay | 10m-15m | Cable Burial |
| 2001 | Well-head Deburial | Malaysia | Shell | Sands & Light Clay | 80m | Salvages/Decommissioning |
| 2000 | Post-Trenching 70km Of 36" Pipeline - continued | Egypt | GUPCO/BP | Sands & Light Clay | 5m-65m | New Installations |
| 1999 | Post-Trenching 70km Of 36" Pipeline | Egypt | GUPCO/BP | Sands & Light Clay | 5m-65m | New Installations |
| 1998 | Harbour Clearance | Montrose, Scotland | Montrose Port Authority | Silt | 5m | Harbour Clearance |
| 1998 | Seabed Preparation For Rock dumping | Wales | Balfour Beattie/Bechtel | Silts & Clay | 10m | New Installations |