Rotech Subsea are responsible for over 500 projects worldwide since 1994. Our track record demonstrates the wide range of locations and project types we have worked on in the Pre-Commissioning, Commissioning, Decommissioning and IRM stages of both the Renewables and Oil&Gas sectors.

Project Date Scope of Work & Tooling Location Seabed Material Water depth
C22-197 April to August 2023 Sandwave / Route Clearance / Cable Trenching
TRS2 CFE System / RS2-3 Hybrid Jet Trencher
CFXD OWF Soft Soil/Sand/Stiff Clay 12m - 40m
C23-060
Case Study
August & September 2023 Pipeline De-burial
TRS1 CFE System
Danish Sector, North Sea Silty Sand 45m
C23-141 August 2023 Cable Trenching
RS2-3 Hybrid Jet Trencher
North Sea Coarse Sand/Gravel & High Strength Clay 3m to 6m
C23-097 August 2023 Cable Trenching
TRS1LD Jet Trencher
Southern North Sea Soft Soil/Sand 10m
C23-065
Case Study
July to August 2023 Cable Remedial Lowering
TRS1 CFE System
USA Sand 5m to 10m
C23-106 July 2023 Pipeline De-burial
TRS2 CFE System
North Sea Sand 22m
C23-090
Case Study
June to July 2023 Cable De-burial and Debris Clearance
RS2 CFE System & RSG Boulder Grab
Atlantic Ocean Sand & Debris 30m
C23-080 May 2023 Cable Trenching
TRS1LD Jet Trencher
North Sea Sand 28m to 36m
C22-193
Case Study
March to May 2023 Cable IRM / Cut & Recovery
TRS2 CFE System & RSG-C Subsea Grab & Cutter
North Sea Extremely Dense
Medium to Silty Sand
22m to 26m
C23-048
Case Study
April to May 2023 Cable Trenching & Rock Removal
TRS1LD Jet Trencher & RSBG Boulder Grab
Seagreen, North Sea Silty Sand 3m to 4m
C23-084 April to May 2023 Cable Remedial Lowering
TRS1 CFE System
USA Sand 8m to 12m
C23-014 April 2023 Pipeline De-burial & Rock Dump Dispersal
TRS2 CFE System
North Sea Rock Dump 91m
C21-145 April 2023 Pipeline De-burial
TRS1 CFE System
North Sea, Danish Sector Silty Sand 65m
C22-183 February to April 2023 Interconnector Remedial Burial
TRS2 CFE System
North Sea Silty Sands and Clay 3m – 65m
C23-051 March to April 2023 Pipeline De-burial
TRS1LD Jet Trencher
North Sea Sand 30m
C22-204 March 2023 Umbilical Trenching
RS2-3 Hybrid Jet Trencher
North Sea Medium Dense Silty Sands, Clay Layers 110m - 121m
C22-178 December 2022 to January 2023 Pipeline De-burial
TRS1 CFE System
North Sea Loose to Medium Dense Silty Sands 35m - 39m
C22-157 September to December 2022 Umbilical Trenching
RS1 LD-3 Hybrid Jet Trencher
Black Sea Sand & Clay 2m to 20m
C22-090 October to December 2022 Cable Trenching – Phase 1
TRS1 CFE System
Vineyard OWF, Atlantic Ocean Sand, Medium Sand 5m to 10m
C22-024 March to December 2022 Cable Trenching
TRS2 CFE System & Jetting Pack
Bahrain / Caspian Sea Silty Sand, Gravel & Clay 2m to 8m
C21-147 September to November 2022 Cable Trenching
TRS1LD Jet Trencher
CFXD OWF Soft Soil & Stiff Clay 12m – 40m
C21-147 March to November 2022 Sandwave / Route Clearance
TRS2 CFE System
CFXD OWF Soft Soil / Sand 12m – 40m
C21-147 March to September 2022 Debris Clearance
RSBG – Subsea Grab
CFXD OWF N/A 12m – 40m
C22-098 October 2022 Cable de-burial and Post-lay Trenching
TRS2 CFE System & RSG-C Subsea Grab&Cutter
Nordegrunde OWF Loose Sand 2m - 10m
C22-094 October 2022 Burial of 5 inline cable joints
RS1-3 Hybrid Jet Trencher
Ostwind 2 OWF Soft Sand & Stiff Clay 19m - 31m
C22-174 September 2022 Pipeline De-burial
RS1 CFE System
Southern North Sea Soft Silty Sand 35m
C22-138 September 2022 Cable De-burial and Post-lay Trenching
TRS2 CFE System
Taiwan - Greater Changhua OWF Silt & Sand 18m - 28m
C22-126 August 2022 Cable Repair
TRS2 CFE System & RSG-C Subsea Grab&Cutter
Wintershall / North Sea Loose Sands 35m – 37m
C19-144 ph1. June-July 2022 Sandwave Clearance
TRS2
Yunlin OWF. Taiwan Sand waves
C19-144 ph2. Mar-nov 2021 Sandwave Clearance
TRS2
Yunlin OWF. Taiwan Sand waves
C19-144 ph3. Mar'21 - sept'22 Sandwave & Route Clearance
TRS2
Yunlin OWF. Taiwan Sand waves
C19-147 ph1. Mar'22 - sept'22 Sandwave & Route Clearance
TRS2
Yunlin OWF. Taiwan Sand waves
C22-136 August 2022 F/O Cable Trenching
TRS1LD Jet Trencher
Belgium / SNS Sand / Gravel 35m & 40m
C22-089 July 2022 F/O Cable Trenching
TRS1LD Jet Trencher
Offshore Lowestoft Sand / Gravel 2.5m - 24m
C21-189 July 2022 Export Cable De-burial, Cut and Recovery & Post Lay Trenching
RS1-3 Hybrid Jet Trencher & RSG-C
Gwynt Y Mor Silty Sand, Glacial Till & Gravelly Clay 2.6m - 11m
C22-073 June 2022 8"Pipeline Trenching
TRS1
Trinidad & Tobago Sand & Soft Clay 17m -27m
C21-087
Case Study
June 2022 Cable Trenching
TRS1LD Jet Trencher
F2 OWF - Taiwan Silty Sands, Clays, Very Dense Gravel & Cobbles. 35m - 55m
C22-022
Case Study
June 2022 Cable De-burial and Post-lay Trenching
RS2
St Nazaire OWF Soft Sand 27m
C22-087 May 2022 Cable De-burial, Cut and Recovery & Post Lay Trenching
RS2-3 Hybrid Jet Trencher & RSG-C
East Anglia One OWF Silty Sands / Very Dense Gravelly Sand, Stiff Clays 29m - 50m
C22-035 April 2022 Cable Lowering / Remedial Burial
RS1-2 Hybrid Trencher
Riffgat, Dolwin 1 & 2, Nordergrunde Medium Dense to Very Dense Sand 3m - 13m
C22-032 April 2022 Cable De-burial, Cut and Recovery & Post Lay Trenching
RS2-3 Hybrid Jet Trencher & RSG-C
Triton Knoll OWF Boulder Clay 12m - 15m
C21-191 January 2022 Cable Post-lay Trenching
TRS1
Prinses Amalia Wind Park Medium Sand 20m - 25m
C21-157 November 2021 Berth Clearance
TRS2
Glasgow, River Clyde Silty Sand 13m
C20-092 November 2021 Cable Joint Burial
RS1-3 Hybrid Jet Trencher
Ostwind 2 OWF Sandy Soil to Dense Sand 7m - 45m
C21-087 October 2021 Cable De-burial & Post-lay Trenching
TRS1LD Jet Trencher
Southern North Sea Dense Sand 3m - 15m
C21-119 September 2021 HDD Duct De-burial & FO Cable Trenching
TRS2
Atlantic Coast Fine Sand & Sand Banks 5m - 12m
C21-139 September 2021 Cable De-burial, Cutting and Retrieval, Post Lay Trenching
TRS1 & RSG Subsea Grab & Cutter
North Coast of UK Soft Sand 80m - 85m
C21-103 August 2021 Cable De-burial & Post Lay Trenching
RS2
Luchterduinen OWF Soft Sand 20m - 25m
C21-110 August 2021 Umbilical & Pipeline De-burial & Post Lay Trenching
RS2
Buchan and Hannay Field Soft Sandy Clay 115m - 123m
C20-174 August 2021 Cable Post Lay Trenching
TRS2 & Jetting Pack
Ameland Export Cable Loose, Fine Sand & Clay 2m - 9m
C21-100
Case Study
July 2021 Pipeline De-burial
TRS1
IOG Blythe & Vulcan Soft Sand 20m - 30m
C21-015
Case Study
April 2021 Cable Trenching
RS2
RTE St Nazaire Gravel and Sand 4m - 25m
C21-040
Case Study
April 2021 Cable De-burial & Post Lay Trenching
TRS2
Brit-Ned Cable Repair #2 Soft Sand 40m
C20-047
Case Study
March 2021 to June 2021 Export & Array Cable Post-Lay Trenching
TRS1 & TRS2
Changhua OWF / TPC Phase 2 Taiwan Sand, Silty Sand, Silty Clay & Clay 18m - 28m
C21-044
Case Study
March 2021 Cable Remedial Works Including Cutting and Recovery
RSG Subsea Grab & Cutter
Dolwin Alpha, Dolwin OWF Soft Sand 30m - 40m
C20-182 January 2021 Cable Remedial Works Including Cutting and Recovery
RS2 & RSG Subsea Grab & Cutter
Offshore USA Dense Sand 35m - 42m
C19-158
Case Study
January 2021 Umbilical Post-lay Trenching
TRS1
West Baracouta, Australia Medium to Coarse Grained Sand 50m
C20-181
Case Study
January 2021 Dock Wall Clearance / Silt Removal
RS2
Nigg, The Highlands Silty Sand 10m
C20-180 November 2020 Cable De-burial & Post Lay Trenching
RS2 & RS1LD
Hornsea 1 OWF Loose Soil & Clay 30m
C20-151 November 2020 Cable Recovery for Repair and Replacement
RSG Subsea Grab
Offshore Denmark N/A 30m
C20-047
Case Study
March 2020 to October 2020 Export & Array Cable Post-Lay Trenching
TRS1LD Jet Trencher & TRS1
Changhua OWF / TPC Phase 1 Taiwan Sand, Silty Sand, Silty Clay & Clay 18m - 28m
C20-054
Case Study
September 2020 Template & Wellhead Excavation and Backfill.
Recovery of PLET into Subsea Basket.
TRS2 & RSG Subsea Grab
Perenco Thames Phase 2 Decom Sand / Consolidated Rock Dump 40m
C20-008 September 2020 Sand wave Clearance & Cable Remedial Works
TRS2 & RSG Subsea Grab
OWF East Coast of UK Sand waves 9m to 22m
C20-140
Case Study
September 2020 Rock Dump Dispersal
TRS2
Wintershall F16 Rock dump 40m
C20-158 August 2020 Cable Remedial Works Including Cutting and Recovery
RS2 & RSG Subsea Grab & Cutter
OWF East Coast of UK Soft Sand to Dense Sand 20m
C20-088 July 2020 Sand Wave Clearance & Cable Trenching
TRS1
Triton Knoll OWF Sand waves / Sand / Dense / Medium 15m - 25m
C20-065
Case Study
June 2020 Mono Bucket De-burial
TRS1
Deutsche Bucht OWF, North Sea Sand / Loose Dense 40m
C20-016
Case Study
May 2020 Flow Tests to Simulate Thrust Pressure Exerted on Dock Wall
TRS2-H (2020)
Liverpool Harbour N/A 2m - 8m
C19-181 April 2020 Pit Clearance & Cable Joint Post-Lay Trenching
TRS1 & TRS1LD Jet Trencher
Borssele OWF, SNS Medium Sand / Dense Sand / Clay 5m - 55m
C19-019 January 2020 Trench Clearing & Cable Post Lay Lowering
RS1
IFA2 Interconnector (UK Side) Sand / Silt 0.6m - 4.5m
C19-076
Case Study
October 2019 Cable Retrieval to Deck for Decommissioning
RSG Subsea Grab
Norther OWF N/A 25m - 33m
C19-125 October 2019 Remedial Lowering of an HVDC Cable
TRS1LD Jet Trencher & Jetting Pack
IFA2 Interconnector (French Side) Dense Sand to Stiff Clay 6m - 23m
C19-113
Case Study
September 2019 Remedial Lowering of Export / HVDC Cable
TRS1LD Jet Trencher & Jetting Pack
Project Management of Entire Scope - including Vessel Charter
Walney Extension OWF Medium to Dense Sand 6m - 23m
C19-022 March 2019 to September 2019 Cable De-burial & Post Trenching - Project 2
TRS1LD Jet Trencher
SE Coast of UK Medium to Dense Sand 1m - 30m
C17-155 August 2019 Flow Tests to Simulate Thrust Pressure Exerted on Dock Wall
TRS2-H (2019)
Liverpool Harbour N/A 2m - 8m
C19-022 May 2019 to August 2019 Cable De-burial & Post Trenching - Project 1
TRS1
SE Coast of UK Medium to Dense Sand 3m - 30m
C19-077
Case Study
July 2019 Cable Post-lay Trenching & Rock Dump Dispersal
RS2
Borkum Riffgrund OWF Soft Sand & Soft Clay 20m - 30m
C19-071
Case Study
July 2019 Sand wave Clearance for Tracked Trencher & Cable Trenching
TRS2
Norther OWF Soft to Medium Dense Sand 25m - 33m
C19-093 June 2019 Cable De-burial / Post Trenching & Route Clearance
RS1 & RS2
Global Tech 1 OWF Silty Clayey Fine Sand to Medium Dense 37m - 42m
C19-069 June 2019 Cable De-burial & Post Trenching - Project 1
RS2
Western Link HVDC Irish Sea Medium Sand 4m - 10m
C18-157 May 2019 Cable Lowering / Remedial Work
TRS1
Race Bank Soft to Medium Sand 20m - 30m
C19-035
Case Study
April 2019 Cable De-burial, Cable Recovery & Post Lay Trenching
RS2 & RSG
50Hz - Baltic Sea Medium to Dense Sand 15m - 20m
C19-048
Case Study
April 2019 Cable De-burial & Post Trenching - Project 2
RS2
Western Link HVDC Irish Sea Medium Sand 4m -10m
C19-024 April 2019 Rock Dump Dispersal
RS2
Dunlin Oilfield Rock Dump 150m
C19-027 March 2019 Riverbed Rectification / High spot Clearance
TRS2
Bangladesh Soft / Medium Soil 3m - 8m
C18-178 January 2019 Cable Post Trenching & Cable Recovery
TRS1 & RSG
Race Bank OWF Soft Sand to Dense Sand 20m
C18-095 December 2018 Cable Post Trenching
TRS1 & Jetting Pack
Hornsea1 OWF, SNS Medium, Dense Sand Very Hard Dense Soil 25m - 60m
C17-161
Case Study
October2018 Umbilical & Cable Post Trenching
TRS1LD Jet Trencher & Jetting Pack
Safaniya Oil Field, KSA Firm Clay <250 kPa 7m - 10m
C17-161 October 2018 24" Pipeline Post Trenching
TRS1LD Jet Trencher & Jetting Pack
Safaniya Oil Field, KSA Soft Clay <250m 7m - 10m
C18-016
Case Study
September 2018 42" Pipeline Post Trenching & Backfill
TRS2
Manifa Oil Field, KSA Soft Clay & Fine Sand 10m -13m
C17-161 September 2018 16" Pipeline Post Trenching
TRS1LD Jet Trencher & Jetting Pack
Safaniya Oil Field, KSA Soft Clay & Dense Sand 7m - 10m
C18-016 September 2018 42" Pipeline Post Trenching
TRS2
Manifa Project, KSA Soft Clay 8m - 12m
C18-119 August 2018 Cable Post Trenching
RS1
North Sea Link (NSL) Project Sand / Medium Sand 15m - 20m
C18-021 August 2018 Pipeline Free-span Correction & Umbilical Post Trenching
TRS2 & RS1
Phong Lan Dai PLD Project Vietnam Silty Sand & Coarse Sand 125m - 185m
C17-170 May 2018 Cable De-burial & Cutting / Retrieval / Rock Dump Removal
RS2 & RSG
CMS (Caithness and Moray) Project Very Hard Dense Soil / Clay 22m - 25m
C17-170 May 2018 Export Cable De-burial & Post Trenching
TRS1 & Jetting Pack
CMS (Caithness and Moray) Project / North Sea Very Hard Dense Soil / Clay 20m
C18-042 April 2018 Cable De-burial & Post Trenching for IRM
RS1
Offshore Dunkirk, France Dense Sand 10m -12m
C16-060 February 2018 Pontoon Clearance / De-burial
RS1
Montrose, Scotland Soft Silty Sand & Mud 5m - 10m
C17-105
Case Study
December 2017 LIVE 24" Pipeline Free-span Rectification
TRS2
Yadana Field, Myanmar, Asia Soft Clay 10m - 12m
C17-165 December 2017 Cable Post Trenching @ Cable Crossing
RS1
Cobra Cable HVDC Danish Sector / North Sea Medium / Dense Sand 20m - 24m
C17-134
Case Study
November 2017 Export Cable Post Trenching
TRS1 & Jetting Pack
Rentel OWF Belgium SNS Loose Sand / Firm Clay 3.5m - 30m
C17-109 November 2017 De-Burial and Post Trenching of 2 x HVDC Cables and F/O Cable
RS1
Dolwin3 OWF German Sector Sand 27m - 30m
C17-079 November 2017 Cable Joint De-burial & Post Trenching
RS1
HDVC Link, Baltic Sea Granular Sand 16m - 20m
C17-108 October 2017 Cable Joint Burial / Cable Post Trenching
RS1
Borwin3 OWF German Sector / North Sea Dense Sand 21m - 23m
C17-109 September 2017 Cable Post Trenching
RS1
Dolwin3 OWF German Sector Medium Sand 25m - 35m
C17-079 August 2017 LIVE Cable Remedial Post Trenching
RS1
HVDC Link Baltic Sea Granular Sand 16m - 20m
C17-061 June 2017 Rock Dump Removal
RS1
Western Link HVDC Irish Sea Rock Dump 20m - 150m
C17-061 June 2017 Cable De-burial & Post Trenching
RS1
Western Link HVDC Irish Sea Medium Sand 20m - 150m
C17-047 May 2017 Cable De-burial & Post Trenching
TRS2
Southern North Sea (SNS) Dense Sand 25m
C16-054 April 2017 Cable Post Trenching
RS1
Irish Sea West of Duddon Sands OWF Soft Soil - 20kPa 30m
C17-003 March 2017 De-burial & Seabed Preparation
TRS1
North Sea Race Bank OWF Soft Sand 21m
C17-025 March 2017 Cable Post Trenching
TRS2
North Sea Race Bank OWF Soft Soil 1.5m - 8m
C16-086
Case Study
January 2017 Export Cable Post Trenching
TRS2
North Sea Race Bank OWF Soft Sand 8m
C17-035 January 2017 Export Cable Post Trenching
TRS1
Irish Sea Burbo Bank OWF Sand & Clay 11m - 16m
C16-002
Case Study
October 2016 Cable Ends Post Trenching
TRS2
Germany Nordergrunde OWF Soft Silty Sand 1.5m - 4m
C16-050 October 2016 Harbour Pontoon Clearance
RS1
Immingham, England Soft Silty Sand 2m - 6m
C16-066 September 2016 Umbilical De-burial & Post Trenching
TRS1
Ravenspurn SNS Medium Soil - 60kPa 50m
C15-038 August 2016 Cable De-burial - Out of Service Cables (OOS)
TRS1 & Jetting Pack
Galloper OWF SNS Stiff Clay - 180kPa 27m - 36m
C15-012 August 2016 Cable De-burial & Post Trenching
TRS1
Irish Sea Burbo Bank OWF Loose Sand 11m - 16m
C15-012 July 2016 Cable De-burial & Post Trenching
TRS1
Irish Sea Burbo Bank OWG Sand & Clay 11m - 16m
C15-059 April 2016 Cable Post Trenching
RS1
Isle of Jura, Inner Hebrides Dense Sand 5m - 50m
C15-002 November 2015 Cable De-burial & Post Trenching
TRS1
Irish Sea, Gwynt y Môr OWF Soft Sand 5m
C15-001 August 2015 Harbour Deepening & Clearance
RS1 & RS2
Montrose, Scotland Mud & Soft Silty Sand 10m

CABLE TRENCHINGtop
Scope of Work - Cable Trenching Location Seabed Material Water Depth
Cable Post Trenching Southern North Sea (SNS) Medium Clay & Chalk 2m - 35m
Cable Pos Trenching Qatar Soft Sandy Clay 65m
Cable Post Trenching North Sea Sand 2m - 5m
Cable Post Trenching Mexico Firm Clay 30 - 55m
Cable Post Trenching - 200mm Dia North Sea Soft Clay 8m - 12m
Cable Post Trenching - 6" Cable Conduit Scotland Sand & Light Clay 2m - 10m
Cable PostTrenching - 35mm Dia Fibre Cable Scotland Sand & Light Clay 10m - 15m
Cable Post Trenching Germany Medium Clay 40m
Cable Lowering - BritNed Cable North Sea Medium Soft Sand 70m
Cable Post Trenching Ireland Cohesive Soil 4m
Cable Post Trenching Southern North Sea (SNS) Sand 30m
Pre-Sweeping approaches to Wind Turbines Belgium Rock Dump 20m

IRMtop
Scope of Work - IRM Location Seabed Material Water Depth
Footprint Excavation North Sea Cohesive Soil 90m
Cable De-burial Southern North Sea (SNS) Gravelly Clay & Cobbles 40m
Pipeline Trenching US G.O.M Soft & Hard Soil 15m
Umbilical Trenching US G.O.M Soft & Very Hard Soil 60m
Pipeline Trenching Norway Soft Soil 70m
Debris Clearance India Rock Dump 65m
Conductor Clearance US G.O.M Soft Clay 91m
Cofferdam Excavation US G.O.M Sand & Shell Fragments 33m
Seabed Preparation Turkmenistan Hard Clay 61m
Drill Cuttings Clearance China Mixed Clay 107m
Rock Dump Clearance Russia Rock Dump 50m
Drill Cuttings Clearance Romania Soft Clay 95m
Toppled Platform De-burial US G.O.M Soft Mud & Hard Clay - <140 kPa 37m
Pipeline Trenching US G.O.M Soft Clay 84m
Pipeline Excavation - 36" Pipeline US G.O.M Soft Mud 18m
VK 20" Visual Inspection US G.O.M Mudslide Area 204m
Rock Dump Clearance - 8" Pipeline North Sea Rock Dump 116m
Lift Boat Excavation US G.O.M Soft Mud 15m
Pipeline Excavation - 12" Pipeline US G.O.M Soft Clay & Sand 120m
Pipeline Excavation US G.O.M Medium Clay 167m
Cable De-burial - 132mm Dia North Sea Sand 2m - 7m
Pipeline De-burial - 10" Dia Australia Silt & Sand 15m
Pipeline De-burial - 10" Dia NW Australia Silty Sand & Shells 150m
Pipeline Excavation - 24" Dia US G.O.M Soft Clay 60m
Pipeline De-burial - 10" Dia US G.O.M Firm Clay 152m
Pipeline De-burial - 6" Dia US G.O.M Soft Mud 67m
Pipeline De-burial - 12" Dia US G.O.M Soft Mud 80m
Pipeline De-Burial - 6" Dia US G.O.M Soft Clay 67m
Cable De-Burial & Post Trenching North Sea Sand & Silt 2m - 12m
Pipeline De-burial North Sea Soft Clay 140m
Valve Cover Clearance US G.O.M Soft Clay 50m
Pipeline De-burial North Sea Soft Clay 30m
Pipeline De-burial US G.O.M Firm Clay 20m
Pipeline De-burial US G.O.M Firm Clay 20m
Pipeline Trenching for Repair US G.O.M Soft Mud 187m
Pipeline Trenching for Repair US G.O.M Soft Mud 230m
Pipeline Trenching for Repair US G.O.M Soft Mud 200m
Pipeline Post Trenching - 30" Dia US G.O.M Compacted Sand / Clay 3m
Post Hurricane Pipeline Repair US G.O.M Mud 1000m
Post Hurricane Repair Work US G.O.M Mud 10m
Pipeline Post Trenching - 44" Dia US G.O.M Sand 3m - 6m
Post Hurricane Repair Work US G.O.M Mud 20m - 40m
Pipeline De-burial for inspection - 32" & 24" Dia North Sea Rock Dump Clearance 110m
Pipeline De-burial North Sea Sand 15m - 25m
Seabed Preparation & Pipeline Post Trenching - 24" Dia Egypt Sand & Soft Clay 12m - 40m
Seabed Preparation for Habitat Installation North Sea Sand & Soft Clay 45m
Pipeline De-burial US G.O.M Sand 210m
Pipeline De-burial US G.O.M Mud 40m - 60m
Pipeline De-burial US G.O.M Mud 290m
Pipeline De-burial US G.O.M Mud 75m
De-burial of Mine Outfall Pipes & Area Clearance North Sea Silt 14m
Freespan Correction Gulf of Thailand Mud Waves 80m
Seabed Preparation for Jack-up Rig Spud Cans Bay of Bengal Sand 100m
Seabed Preparation for Jacket installation East Timor Sea Sands & Clay 85m
Seabed Preparation for Rock dumping Irish Sea Silty Sand 10m

Decommissioning & Salvage Worktop
Scope of Work - DECOM Location Seabed Material Water Depth
Conductor Excavation US G.O.M Sand 16m
Platform Excavation US G.O.M Soft Soils 64m
De-burial of a Tunnel Boring Machine Australia Sand / Soft Clay 20m
Subsea Assembly US G.O.M Hard Clays 17m
Platform Excavation US G.O.M Soft Soils 34m
Platform Salvage US G.O.M Mud 183m
Wellhead Excavation US G.O.M 23kPa 30m
Backfill Removal US G.O.M Medium Clay 55m
Caisson Excavation US G.O.M Mixed Clay 43m
Caisson Excavation US G.O.M Soft Backfill 42m
Caisson Excavation US G.O.M Soft to Medium Clay 54m
Platform Excavation US G.O.M Soft Clay 47m
Caisson Excavation US G.O.M Mixed Clay 40m
Caisson Excavation US G.O.M Soft Clay 95m
Platform Leg Excavation US G.O.M Mixed Clay 22m
Debris Removal US G.O.M Mixed Clay 40m
Caisson Excavation US G.O.M Soft Mud 62m
Debris Removal US G.O.M Soft Clay 50m
Jacket Excavation US G.O.M Medium Clay 51m
Debris Removal US G.O.M Soft Clay 66m
Jacket Excavation US G.O.M Soft Clay 72m
Deck Salvage Excavation US G.O.M Soft Mud 69m
Jacket and Debris Excavation US G.O.M Soft Clay 61m
Caisson Excavation US G.O.M Silty Sand 20m
Caisson Excavation US G.O.M Soft Clay 76m
Platform Salvage US G.O.M Soft Clay 70m
Well Head Excavation US G.O.M Medium Clay 25m
Well Head Excavation US G.O.M Medium Clay 60m
Platform Recovery US G.O.M Medium Clay 70m
Platform Recovery US G.O.M Medium Clay 76m
20" Pipeline De-burial US G.O.M Soft Clay 204m
Platform Recovery US G.O.M Medium Clay 30m
Debris basket collection and deck salvage US G.O.M Medium Clay 25m
Two 26" Well Heads 15' BML US G.O.M Medium Clay 72m
Barge Salvage US G.O.M Sandy / Silty Clay 3.5m
Platform Abandonment US G.O.M Soft Mud 27m
Heat Exchanger Burial East Timor Sandy / Silty Clay 80m - 100m
Trunk line Excavation US G.O.M Soft Mud 38m
Conductor Excavation US G.O.M oft Clay 37m
Platform Salvage US G.O.M Soft Clay 70m
Platform Salvage US G.O.M Soft Clay 70m
Platform Salvage US G.O.M Soft Clay 72m
Platform Deck Salvage US G.O.M Soft Clay 70m
Well Intervention US G.O.M Soft Clay 42m
Conductor Excavation US G.O.M Soft Clay 40m
Platform Salvage US G.O.M Soft Clay 72m
Mooring Wire Abandonment New Zealand Silt 115m
60" Caisson Excavation US G.O.M Soft Clay 8m
Well-Head Excavation US G.O.M Medium Clay 46m
Well-Head Excavation US G.O.M Medium Clay 40m
Well-Head Excavation US G.O.M Soft Clay 45m
Platform Salvage Excavation US G.O.M Soft Clay 70m
Platform Leg Excavation US G.O.M Soft to Medium Clay 70m
Jacket Leg Excavations US G.O.M Soft Clay 50m
Platform Salvage/Well Excavations US G.O.M Soft to Firm Clay 40m
Conductor Excavation US G.O.M Soft Mud 70m
Conductor Excavation US G.O.M Soft Clay 30m
Wellhead & Jacket Leg Excavation US G.O.M Soft Clay 32m
Wellhead Excavation US G.O.M Firm Clay 30m
Backfilling Well Excavation US G.O.M Soft Mud 50m
Wellhead Excavation US G.O.M Soft Mud 50m
Wellhead Excavation US G.O.M Firm Clay 30m
Wellhead Excavation US G.O.M Firm Clay 45m
Jacket Leg Excavation - Decommissioning US G.O.M Mud 70m
Post Hurricane Conductor De-burial US G.O.M Mud 40m
Jacket Leg Excavation - Decommissioning Indonesia Sand & Soft Clay 85m
Jack-up Rig Leg Recovery US G.O.M Firm Clay 110m
Providing Access for Hydraulic Pipeline Cutter Singapore Rock & Backfill Removal 20m
De-burial of Jack-up Spud Cans North Sea - Dutch Sector Sand to Firm Clay 50m - 60m
Well Head De-burial Malaysia Sand & Light Clay 80m
Spud Can Excavation Vietnam Sand 5m

Pipeline Trenchingtop
Scope of Work - Pipeline Trenching Location Seabed Material Water Depth
Pipeline Post Trenching Bahamas Sand 28m
Pipeline Post Trenching Mexico Clay 50m
Pipeline Post Trenching Mexico Clay 50m
Pipeline Crossing Remediation Trinidad & Tobago Clayey Soils 55m
Pipeline Post Trenching US G.O.M Soft pre-disturbed material 61m
Pipeline Trenching & Free-span Rectification Iran Soft, Silty Clay 64m
Pipeline Post Trenching - 20" Dia US G.O.M Soft Clay & Sand 76m
Pipeline Post Trenching - 16" Dia Persian Gulf Soft Clay & Sand 3m - 7m
Pipeline Post Trenching Mexico Medium Clay 50m
Pipeline Post Trenching Indonesia Silty Clay 12m
Flexible Pipeline De-burial Norway Soft Clay 12m
Pipeline Installation Venezuela Soft mud/clay 150m
Seabed Levelling U.S. G.O.M Soft Clay 40m
Pipeline Crossings Mexico Firm Clay 35m
Pipeline Post Trenching - 20" & 24" Dia Mexico Firm Clay 80m
Pipeline Post Trenching - 24" & 36" Dia Mexico Firm Clay 35m
Pipeline Post Trenching - 20" Dia Mexico Firm Clay 40m
Pipeline Post Trenching - 12" Dia Venezuela Soft Mud 10m
Pipeline Post Trenching - 36" Dia Mexico Firm Clay 40m
Pipeline Post Trenching - 20" Dia Middle East Sandy Silt 5m - 21m
PipelinePost Trenching - 16" Dia Mexico Firm Clay 50m
Pipeline Post Trenching - 12" Dia US G.O.M Soft Clay 40m
Pipeline Crossings Saudi Arabia Clayey Sand 9m - 36m
Pipeline Post Trenching - 12" Dia Venezuela Soft Mud 5m - 25m
Pipeline Post Trenching - 16" Dia Mexico Firm Clay 33m
Pipeline Post Trenching - 8" Dia US G.O.M Soft Clay 40m
Pipeline Post Trenching - 16" Dia Mexico Firm Clay 33m
Pipeline Post Trenching - 8" Dia US G.O.M Soft Clay 40m
Sandwave Clearance & Post Trenching 20" Dia India Soft Sand & Clay 25m - 40m
Pipeline Post Trenching - 24" Dia Mexico Firm Clay 50m
Post Trenching Pipeline Mexico Firm Clay 50m
Pipe Crossing Post Trenching - 12" & 36" Dia Mexico Sand & Mud 50m
Pipeline Trenching US G.O.M Sand 46m
Pipeline Post Trenching - 12", 24" & 36" Dia Mexico Sand & Clay 66m
Pipeline Post Trenching - 8" & 10" Dia US G.O.M Soft Mud 65m
Pipeline Post Trenching - 36" Dia Mexico Soft Mud 80m
Pipeline Post Trenching - 12" Dia US G.O.M Soft Mud 70m
Pipeline Trenching Mexico Soft Clay 60m
Pipeline Trenching U.S. G.O.M Soft Clay 40m
Pipeline Trenching U.S. G.O.M Firm Clay 25m
Post Trenching 24" Pipelines Mexico Soft Clay 80m
Post Trenching Pipeline Mexico Soft Clay 45m - 65m
Post Trenching 12" Pipeline U.S. G.O.M Soft Clay 15m
Pipeline Trenching Trinidad Soft Mud 75m
Post Trenching 12", 18" & 20" Pipelines Mexico Firm Clay 40m - 55m
Pipeline Crossing Preparation Mexico Firm Clay 50m
Pipeline Trenching & Crossing Preparation Mexico Firm Clay 40m - 60m
Pipeline Trenching 30" Pipeline Mexico Clay 45m
Post Trenching 20" Pipeline Mexico Firm Clay 40m - 55m
Post Trenching 30" Pipeline Mexico Clay 45m
Post Trenching 11" Pipeline Mexico Clay 20m - 30m
Post Trenching 10" Pipeline Mexico Clay 20m - 30m
Post Trenching 10" Pipeline Mexico Firm Clay 50m
Post Trenching 10" Pipeline Mexico Clay 20m - 30m
Post Trenching 11" Pipeline Mexico Clay 20m - 30m
Post Trenching 10" Pipeline Mexico Clay 50m
Post Trenching 2 x 12" Pipelines India Firm Clay 4m - 20m
Pipeline Post Trenching - 12" Dia India Firm Clay 2m - 5m
Pipeline Post Trenching - 8" Dia Mexico Firm Clay 40m - 50m
Pipeline Post Trenching - 24" Dia Mexico Firm Clay 40m - 50m
Pipeline Post Trenching - 20" Dia Indonesia Firm Clay 5m - 10m
Numerous Pipe Crossings - 6" & 8" Dia Mexico Firm Clay 38m - 55m
Pipeline Post Trenching - 20" & 24" Dia Mexico Firm Clay 40m - 50m
Pipeline Trenching Mexico Firm Clay 40m - 60m
Pipeline Post Trenching - 24" Dia Indonesia Firm Clay 5m
Pipeline Post Trenching Shore Approach - 30" Dia Cameroon Sand & Clay 3m - 8m
Pipeline & Umbilical Post Trenching Egypt Sand & Clay 8m - 20m
Pipeline Post Trenching - Various Sizes Egypt Sand with No Cohesion 2m - 10m
Pipeline Post Trenching Mexico Clay 40m - 60m
Pipeline Post Trenching - Various Sizes Mexico Sands & Clay 40m - 60m
Pipeline Post Trenching - Various Sizes Egypt Sand with No Cohesion 2m - 8m
Pipeline Post Trenching - 36" Dia Egypt Sands & Light Clay 5m - 65m
Backfilling of a 45km trench Mexico Sand & Clay 40m - 60m

Pipeline Tie-Instop
Scope of Work Location Seabed Material Water Depth
Subsea Tie-In Excavation U.S. G.O.M Soft Mud 55m
Trench Clearing/Rock Dump Removal Sakhalin Sandy Sediment 35m
Subsea Tie-In Trenching U.S. G.O.M Firm Clay 30m
Subsea Tie-In/8" Pipeline De-burial U.S. G.O.M Soft Clay 210m
Pipeline De-burial North Sea Sand 110m
Rock Dump Removal Sakhalin, Russia Large & Small Rocks 30m
Pre & Post Trenching Sakhalin, Russia Sand 10m - 30m
Rock Dump Removal 300 - 400 mm W Australia Rock Dump Removal 125m
Tie-in Excavation U.S. G.O.M Soft Mud 206m
Rock Dump Removal for Pipeline De-burial North Sea Rock dump 100mm 100m - 110m
Seabed Preparation for Tie-In Installation North Sea Sands & Very Soft Clay 43m
Post Trenching of two Pipelines North Sea Sand 2m - 5m

Harbour Clearancetop
Scope of Work Location Seabed Material Water Depth
Harbour Clearance Scotland Stiff Mud 12m
Berth Clearance Scotland Mud/Silt 4m - 8m
Jetty Clearance - Multiple Indonesia Silt/Mud 11m - 20m
Jetty Clearance - Decommissioning Azerbaijan Silt, Mud & Soft Clay 4m - 6m
Harbour Clearance Scotland Silt 5m